A platform for research: civil engineering, architecture and urbanism
Perini Handles Unusual Foundations On B.C.'s Port Mann Bridge.
Pile driving operations and cofferdam construction methods used for foundations for bridge over Fraser River at Port Mann, B.C.; stiffened tied arch type main superstructure will have 1200 ft center span. 360 ft side spans and maximum high water clearance of 145 ft; bridge deck will be 1/2 in. thick steel plate covered with special composition asphalt surface; overall cost of project is $25,000,000.
Perini Handles Unusual Foundations On B.C.'s Port Mann Bridge.
Pile driving operations and cofferdam construction methods used for foundations for bridge over Fraser River at Port Mann, B.C.; stiffened tied arch type main superstructure will have 1200 ft center span. 360 ft side spans and maximum high water clearance of 145 ft; bridge deck will be 1/2 in. thick steel plate covered with special composition asphalt surface; overall cost of project is $25,000,000.
Perini Handles Unusual Foundations On B.C.'s Port Mann Bridge.
Roads Eng Construction
1960
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of foundations of Port Mann bridge
Engineering Index Backfile | 1964
|Design of main foundations of Port Mann bridge
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1964
|PROGETTI: Ponte Galeria - Pierfrancesco Perini
Online Contents | 2002
Port Mann bridge, Vancouver, Canada
Engineering Index Backfile | 1965
|