A platform for research: civil engineering, architecture and urbanism
Pressure tunnel for pumped storage plant of Roenkhausen
Blasting and excavating procedure used in construction of 360 m long level and 530 m steep sections of pressure tunnel linking upper and lower reservoirs to power plant; blasting and lining of test section, construction procedure, and methods of supervision are described; tunnels and shafts are steel supported and shotcreted.
Pressure tunnel for pumped storage plant of Roenkhausen
Blasting and excavating procedure used in construction of 360 m long level and 530 m steep sections of pressure tunnel linking upper and lower reservoirs to power plant; blasting and lining of test section, construction procedure, and methods of supervision are described; tunnels and shafts are steel supported and shotcreted.
Pressure tunnel for pumped storage plant of Roenkhausen
Der Druckstollen des Pumpspeicherwerks Roenkhausen
Riemann, U. (author)
Tiefbau ; 8
1966
6 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
FEATURES - PUMPED STORAGE - Introducing CEZ's Stechovice pumped storage plant
Online Contents | 2002
Engineering Index Backfile | 1960
|Leningrad pumped-storage power plant
Online Contents | 2013
|Leningrad pumped-storage power plant
Springer Verlag | 2013
|