A platform for research: civil engineering, architecture and urbanism
Circular tunnel and pressure shaft for pumped storage works of Happurg, tunnel construction in clayey mountain
Total length is 1000 m including 175 m vertical shaft; shaft solution was employed to reach necessary depth, where horizontal tunneling could be continued in hard shale soil; shaft has 3.7 m ID and 0.4 m thick concrete walls; horizontal tunnel has 5.5 m ID, 0.30 m walls, and includes concrete conduit of 3.7 m ID.
Circular tunnel and pressure shaft for pumped storage works of Happurg, tunnel construction in clayey mountain
Total length is 1000 m including 175 m vertical shaft; shaft solution was employed to reach necessary depth, where horizontal tunneling could be continued in hard shale soil; shaft has 3.7 m ID and 0.4 m thick concrete walls; horizontal tunnel has 5.5 m ID, 0.30 m walls, and includes concrete conduit of 3.7 m ID.
Circular tunnel and pressure shaft for pumped storage works of Happurg, tunnel construction in clayey mountain
Rohrstollen und Druckschacht des Pumpspeicherwerks Happurg, ein Hohlraumbau in tonigem Gebirge
Abraham, K.H. (author)
Bauingenieur ; 35
1960
9 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Pressure tunnel for pumped storage plant of Roenkhausen
Engineering Index Backfile | 1966
|Rocky Mountain Pumped Storage Project: Performance of Reservoirs, Dams and Power Tunnel
British Library Conference Proceedings | 1997
|Pumped storage tunnel based on TBM construction and construction method
European Patent Office | 2024
|Constructing a railway tunnel in clayey ground
Engineering Index Backfile | 1929
Construction of Cobble Mountain diversion tunnel
Engineering Index Backfile | 1933
|