A platform for research: civil engineering, architecture and urbanism
Planning, design, and construction of major urban flood control project is presented; emphasis is placed on flood hydrology investigations used as basis for sizing of culverts, open channels, and structures; information is given on model testing of inlet structure to assure control of rate of flood waters entering outfall culvert; techniques for designing open channels, both concrete and grass-lined, are described; underflow pipes were used to carry normal low flows; planning of construction schedule by design engineer is described, together with methods of construction and results of alternate bids for large diameter concrete pipe and concrete box culvert.
Planning, design, and construction of major urban flood control project is presented; emphasis is placed on flood hydrology investigations used as basis for sizing of culverts, open channels, and structures; information is given on model testing of inlet structure to assure control of rate of flood waters entering outfall culvert; techniques for designing open channels, both concrete and grass-lined, are described; underflow pipes were used to carry normal low flows; planning of construction schedule by design engineer is described, together with methods of construction and results of alternate bids for large diameter concrete pipe and concrete box culvert.
Harvard gulch flood control project
ASCE -- Proc (J Irrigation Drainage Div)
Wright, K.R. (author)
1967
18 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
A Case Study of the Goldsmith Gulch Flood Control Project
British Library Conference Proceedings | 1997
|Stuart Gulch Dam, Idaho, Project
NTIS | 1971
Stuart Gulch Dam, Idaho Project
NTIS | 1972
ASCE | 2021
|