A platform for research: civil engineering, architecture and urbanism
Harbour developments at galway
Description of work carried out for providing turning space for vessels in deepened dock which included permanent closing of existing Commercial Dock entrance, and removal of 25,000 cu yd of accumulated silt from Commercial Dock and 6000 cu yd from Dun Aengus Dock; rock excavation over 6 ft, linking of Commercial Dock and Dun Aengus Dock, dredging of approximately 120,000 cu yd of accumulated silt from Approach Channel and outer harbor area, construction of passenger terminal building on Approach pier, and demolition of existing transit and stores sheds are described; construction methods are given.
Harbour developments at galway
Description of work carried out for providing turning space for vessels in deepened dock which included permanent closing of existing Commercial Dock entrance, and removal of 25,000 cu yd of accumulated silt from Commercial Dock and 6000 cu yd from Dun Aengus Dock; rock excavation over 6 ft, linking of Commercial Dock and Dun Aengus Dock, dredging of approximately 120,000 cu yd of accumulated silt from Approach Channel and outer harbor area, construction of passenger terminal building on Approach pier, and demolition of existing transit and stores sheds are described; construction methods are given.
Harbour developments at galway
Civ Eng (Lond)
1966
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2005
|Galway : architectural heritage
UB Braunschweig | 1985
|Further developments at Singapore Harbour
Engineering Index Backfile | 1963
|Callcenter in Galway - Buchholz McEvoy, Dublin
Online Contents | 2005