Formwork for concrete on Ramganga project
Details of various formwork arrangements adopted for chute spillway and diversion tunnel stilling basins under construction; total amount of concreting involved in structures is approximately 154,000 cu m and total form area to be covered is about 74,000 cu m; top of concrete is required to be finished to tolerance of 10 mm due to high velocity of flow over surface.
Formwork for concrete on Ramganga project
Details of various formwork arrangements adopted for chute spillway and diversion tunnel stilling basins under construction; total amount of concreting involved in structures is approximately 154,000 cu m and total form area to be covered is about 74,000 cu m; top of concrete is required to be finished to tolerance of 10 mm due to high velocity of flow over surface.
Formwork for concrete on Ramganga project
Indian Concrete J
Singhal, N.N. (author)
1967
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydrologic designs of Ramganga Dam project
Engineering Index Backfile | 1968
|Hydrologic Design of Ramganga Dam Project
ASCE | 2021
|Erratum for “Hydrologic Design of Ramganga Dam Project”
ASCE | 2021
|Environmental Impact of Ramganga Dam
British Library Conference Proceedings | 1995
|Erratum for “Hydrologic Design of Ramganga Dam Project”
ASCE | 2021
|