A platform for research: civil engineering, architecture and urbanism
Technique of application of temporary bridging to withdraw 60-ft plate-girders over 220-ft gap without cranes and temporary supports is described.
Dismantling long spans with Bailey bridging
Ry Gaz
Singh, N. (author)
Railway Gazette ; 124
1968
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bailey truss and construction method for hoisting and dismantling Bailey truss
European Patent Office | 2024
|