Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Technique of application of temporary bridging to withdraw 60-ft plate-girders over 220-ft gap without cranes and temporary supports is described.
Dismantling long spans with Bailey bridging
Ry Gaz
Singh, N. (Autor:in)
Railway Gazette ; 124
1968
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bailey truss and construction method for hoisting and dismantling Bailey truss
Europäisches Patentamt | 2024
|