A platform for research: civil engineering, architecture and urbanism
Heavy tunnelling work -- Kiewa hydro-electric scheme
Over 4000 ft of 16-ft wide tunnel driven; ultimate hydro plant capacity 104, 000 kw; details of tunneling operations on first section of scheme (No 3 development) which comprises pipe line tunnel, rise, and head race tunnel; description of construction plant. (see also Chem Eng and Min Rev v 34 n 402 Mar 10 1942 p 171-7)
Heavy tunnelling work -- Kiewa hydro-electric scheme
Over 4000 ft of 16-ft wide tunnel driven; ultimate hydro plant capacity 104, 000 kw; details of tunneling operations on first section of scheme (No 3 development) which comprises pipe line tunnel, rise, and head race tunnel; description of construction plant. (see also Chem Eng and Min Rev v 34 n 402 Mar 10 1942 p 171-7)
Heavy tunnelling work -- Kiewa hydro-electric scheme
Commonwealth Engr
Kernot, C.H. (author)
1942
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Heavy tunnelling work -- Kiewa hydro-electric scheme
Engineering Index Backfile | 1942
|Tunnelling at the Klippen hydro scheme
Online Contents | 1993
|Construction work on the Shannon hydro-electric scheme
Engineering Index Backfile | 1928
Ma An hydro scheme in the context of Taiwan tunnelling
Online Contents | 1995
|Problems Faced in Tunnelling in Dulhasti Hydro-Electric Project
British Library Conference Proceedings | 1998
|