A platform for research: civil engineering, architecture and urbanism
Construction work on the Shannon hydro-electric scheme
Three-hinged arch over headrace at Clonlara; span is 137 ft. 9 in. at level of springing hinges and rise 15 ft. 5 in.; width of roadway will be 14 ft. and footpath 4 ft. 7 in. wide; falsework and forms.
Construction work on the Shannon hydro-electric scheme
Three-hinged arch over headrace at Clonlara; span is 137 ft. 9 in. at level of springing hinges and rise 15 ft. 5 in.; width of roadway will be 14 ft. and footpath 4 ft. 7 in. wide; falsework and forms.
Construction work on the Shannon hydro-electric scheme
Concrete Constr. Eng
1928
4 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction works on the shannon hydro-electric scheme
Engineering Index Backfile | 1929
Shannon hydro-electric power scheme
Engineering Index Backfile | 1928
The Shannon hydro-electric scheme
Engineering Index Backfile | 1929
|River Shannon hydro-electric scheme: Fort Henry embankment, upstream slope failure and remedial work
British Library Conference Proceedings | 2002
|River Shannon hydro-electric scheme: failure of upstream slope of Fort Henry Embankment: Analysis
British Library Conference Proceedings | 2002
|