A platform for research: civil engineering, architecture and urbanism
Operation to be carried out consisted of driving of 6-in. by 6-in. timber piles ranging, according to ground conditions, from 18 ft to 26 ft in length, to form main support for new revetment of badly eroded river bank; description of methods and equipment used in completing job.
Operation to be carried out consisted of driving of 6-in. by 6-in. timber piles ranging, according to ground conditions, from 18 ft to 26 ft in length, to form main support for new revetment of badly eroded river bank; description of methods and equipment used in completing job.
Pile driving without pile frame
Instn Civ Engrs -- J
Pearson, S. (author)
1942
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pile driving barge pile frame pile reversing mechanism and working method thereof
European Patent Office | 2024
|Pile frame jacking device of pile driving barge, and pile frame jacking and lying method
European Patent Office | 2020
|