A platform for research: civil engineering, architecture and urbanism
Driving of 19,500 tons of steel sheetpiling 80 to 100 ft long, for first stage of cellular cofferdam at TVA's big Kentucky Dam was done by pair of four-hammer rigs, two gantries and two crawler cranes traveling on trestle; floating drivers and cranes aided land equipment; steel pipe templates spotted sheets for forming cells.
Driving of 19,500 tons of steel sheetpiling 80 to 100 ft long, for first stage of cellular cofferdam at TVA's big Kentucky Dam was done by pair of four-hammer rigs, two gantries and two crawler cranes traveling on trestle; floating drivers and cranes aided land equipment; steel pipe templates spotted sheets for forming cells.
Big rigs drive Cofferdam piles
Eng News-Rec
Peerson, J.W. (author)
Engineering News-Record ; 128
1942
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Big rigs drive 220-ft pipe piles
Engineering Index Backfile | 1953
|Cutting cofferdam piles at riverbed level
Engineering Index Backfile | 1938
Novel cofferdam scheme saved money with batter piles
Engineering Index Backfile | 1959
|Cofferdam construction method based on steel sheet piles
European Patent Office | 2024
|Cofferdam structure based on double-row steel sheet piles
European Patent Office | 2021
|