A platform for research: civil engineering, architecture and urbanism
Special shoring for building excavation
Steel H-beams were driven to toe-hold in soft rock and tied back to pile anchors that utilize existing pavement to hold banks for excavation of steam plant substructure in Washington, DC; horizontal breast boards are used back of vertical beams to depth where wellpoints are required, then they are set just inside exterior flanges and wellpoints driven back of them; reshoring, as structure rises, is done to obviate necessity for struts through concrete.
Special shoring for building excavation
Steel H-beams were driven to toe-hold in soft rock and tied back to pile anchors that utilize existing pavement to hold banks for excavation of steam plant substructure in Washington, DC; horizontal breast boards are used back of vertical beams to depth where wellpoints are required, then they are set just inside exterior flanges and wellpoints driven back of them; reshoring, as structure rises, is done to obviate necessity for struts through concrete.
Special shoring for building excavation
Eng News-Rec
Engineering News-Record ; 129
1942
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Springer Verlag | 2022
|Shoring system and method of making an excavation with such shoring system
European Patent Office | 2016
|Design of Shoring System for a Deep Foundation Pit Excavation
British Library Conference Proceedings | 2006
|