A platform for research: civil engineering, architecture and urbanism
New lifting bridge at Deptford Creek
Each section of bridge consists of 39 ft front arm comprising three main girders, 61 ft 3 in. long; total weight of each leaf is 482 tons, including 161 tons of counterweight; abutments are of mass concrete supported on 185 reinforced concrete piles; bridge is operated by two 35-hp electric motors on each leaf.
New lifting bridge at Deptford Creek
Each section of bridge consists of 39 ft front arm comprising three main girders, 61 ft 3 in. long; total weight of each leaf is 482 tons, including 161 tons of counterweight; abutments are of mass concrete supported on 185 reinforced concrete piles; bridge is operated by two 35-hp electric motors on each leaf.
New lifting bridge at Deptford Creek
Surveyor
1954
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1963
Reconstruction of deptford creek bridge
Engineering Index Backfile | 1955
|British Library Online Contents | 1996
|Engineering Index Backfile | 1891
Deptford lives: House, Deptford, London - MARK GUARD ARCHITECTS
Online Contents | 1996