A platform for research: civil engineering, architecture and urbanism
Washington's des chutes basin project -- Tide flats become fresh water lake
Earthfill dam 800 ft long built across tidal basin to create 350-acre lake to enhance beauty of Washington State capitol grounds; concrete spillway supported on timber piling and enclosed by four cofferdams; illustrated description of work.
Washington's des chutes basin project -- Tide flats become fresh water lake
Earthfill dam 800 ft long built across tidal basin to create 350-acre lake to enhance beauty of Washington State capitol grounds; concrete spillway supported on timber piling and enclosed by four cofferdams; illustrated description of work.
Washington's des chutes basin project -- Tide flats become fresh water lake
Western Construction
Mottner, R.L. (author)
Western Construction ; 25
1950
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|TIDE PROPAGATION IN CHANNEL WITH ADJACENT TIDAL FLATS
British Library Conference Proceedings | 2007
|Stilling the Waters: Stilling Basin Design for Stepped Chutes
British Library Conference Proceedings | 2015
|DataCite | 1916
|