A platform for research: civil engineering, architecture and urbanism
Machines conquer tough slope-paving job
Illustrated description of concreting inner surfaces of rockfill dikes at 1 on 1 1/2 slope without using face form; special concreting rig was built for job; 16-ft panels, amounting to 106 cu yd each, were placed and finished in 8 hr day; slopes were surfaces of 1400-ft dikes that form major portion of headrace for Soo power plant, Sault Ste Marie, Mich.
Machines conquer tough slope-paving job
Illustrated description of concreting inner surfaces of rockfill dikes at 1 on 1 1/2 slope without using face form; special concreting rig was built for job; 16-ft panels, amounting to 106 cu yd each, were placed and finished in 8 hr day; slopes were surfaces of 1400-ft dikes that form major portion of headrace for Soo power plant, Sault Ste Marie, Mich.
Machines conquer tough slope-paving job
Eng News-Rec
Engineering News-Record ; 147
1951
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
Slope extension speeds reservoir paving
TIBKAT | 1969
|French EPB machines conquer Shanghai soil
Online Contents | 1996
|Slope extension speeds reservoir paving
Engineering Index Backfile | 1968