A platform for research: civil engineering, architecture and urbanism
Reconstruction of double track railroad bridge over Rhine River below Duisburg-Ruhrort (HausKnipp bridge), Germany
Ten of existing 16 spans of steel truss bridge destroyed during war; reconstruction of superstructure and piers; main span 106.08 m, lateral spans 4.1 m length each. (See also - n 1 Sept 1950 p 1-4, n 2 Oct p 11-4)
Reconstruction of double track railroad bridge over Rhine River below Duisburg-Ruhrort (HausKnipp bridge), Germany
Ten of existing 16 spans of steel truss bridge destroyed during war; reconstruction of superstructure and piers; main span 106.08 m, lateral spans 4.1 m length each. (See also - n 1 Sept 1950 p 1-4, n 2 Oct p 11-4)
Reconstruction of double track railroad bridge over Rhine River below Duisburg-Ruhrort (HausKnipp bridge), Germany
Wiederherstellung der zweigleisigen Eisenbahnbruecke ueber den Rhein unterhalb Duisberg-Ruhrort
Reuter, W. (author) / Stoltenburg, W. (author) / Brunner, K. (author)
1950
4 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1953
|Wrecking of old railroad bridge over Rhine river at Duisburg-Hochfeld
Engineering Index Backfile | 1929
|Erection of steel superstructure of Rhine Bridge between Duisburg-Ruhrort and Homberg
Engineering Index Backfile | 1955
|The new double-track railway bridge over the Rhine River near Duisburg-Hochfeld
Engineering Index Backfile | 1926
|The new bridge over the Rhine between Ruhrort and Homberg
Engineering Index Backfile | 1907