A platform for research: civil engineering, architecture and urbanism
Prefab cofferdam simplifies pier repair
Prefabricated cofferdam, consisting of two frames holding double walls of sheet piling, placed successively around piers of Keokuk, Iowa, Municipal Bridge, thus holding back 15 ft of water; pier repair consists in removing deteriorated concrete with pneumatic tools, placing reinforcing bars and pouring new concrete; after repair, cofferdam is moved to next pier.
Prefab cofferdam simplifies pier repair
Prefabricated cofferdam, consisting of two frames holding double walls of sheet piling, placed successively around piers of Keokuk, Iowa, Municipal Bridge, thus holding back 15 ft of water; pier repair consists in removing deteriorated concrete with pneumatic tools, placing reinforcing bars and pouring new concrete; after repair, cofferdam is moved to next pier.
Prefab cofferdam simplifies pier repair
Construction Methods Equipment
Vollmar, Jr., J.E. (author)
1950
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Drilled-pier cofferdam for building
Engineering Index Backfile | 1967
|Nonshrink grout simplifies Pier job
Engineering Index Backfile | 1959
|Rebuilding a bridge pier in a cofferdam
Engineering Index Backfile | 1912
Precast concrete cofferdam and pier construction process
European Patent Office | 2020
|