A platform for research: civil engineering, architecture and urbanism
Triangulation survey was made of entire area involved in project; this survey, including reconnaissance, construction of signals, observation of angles and computations, was made by writer during seven weeks of 1926 summer season. (See also Boston Soc. Civ. Engrs. -- Jl., vol. 14, no. 3, Mar. 1927, pp. 159-168, 10 figs.)
Triangulation survey was made of entire area involved in project; this survey, including reconnaissance, construction of signals, observation of angles and computations, was made by writer during seven weeks of 1926 summer season. (See also Boston Soc. Civ. Engrs. -- Jl., vol. 14, no. 3, Mar. 1927, pp. 159-168, 10 figs.)
Triangulation of the new cascade tunnel
Eng. Contracting
Alvord, H.B. (author)
1927
3 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Triangulation of the new cascade tunnel
Engineering Index Backfile | 1927
|Triangulation preparatory to alignment of a tunnel
Engineering Index Backfile | 1896
|Online Contents | 2015
|Online Contents | 1959
|Modernizing triangulation practice
Engineering Index Backfile | 1930
|