A platform for research: civil engineering, architecture and urbanism
Triangulation survey was made of entire area involved in project; this survey, including reconnaissance, construction of signals, observation of angles and computations, was made by writer during seven weeks of 1926 summer season. (see also Eng. and Contracting, vol. 66, no. 8, Aug. 1927, pp. 375-377, 9 figs)
Triangulation survey was made of entire area involved in project; this survey, including reconnaissance, construction of signals, observation of angles and computations, was made by writer during seven weeks of 1926 summer season. (see also Eng. and Contracting, vol. 66, no. 8, Aug. 1927, pp. 375-377, 9 figs)
Triangulation of the new cascade tunnel
Boston Soc. Civ. Engrs. -- Jl
Alvord, H.B. (author)
1927
10 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Triangulation of the new cascade tunnel
Engineering Index Backfile | 1927
|Triangulation preparatory to alignment of a tunnel
Engineering Index Backfile | 1896
|Online Contents | 2015
|Online Contents | 1959
|Modernizing triangulation practice
Engineering Index Backfile | 1930
|