A platform for research: civil engineering, architecture and urbanism
Two hydroelectric stations were erected, one on southern, one on northern arm, 550 yards apart, and operating as practically one unit.
Two hydroelectric stations were erected, one on southern, one on northern arm, 550 yards apart, and operating as practically one unit.
The Breslau hydro-electric works
AEG Progress
Sticher, R. (author)
AEG Progress ; 2
1926
6 pages
10 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Superphosphate works in Breslau
Engineering Index Backfile | 1926
|Hydro-electric civil engineering works
Engineering Index Backfile | 1949
|Hydro-electric works in Scotland
Engineering Index Backfile | 1948
Tummel-garry hydro-electric works
Engineering Index Backfile | 1949
Hydro-electric works in Scotland
Engineering Index Backfile | 1949