A platform for research: civil engineering, architecture and urbanism
Canal headworks incorporated in structure of dam; apron shaped to localize jump near over-fall; foundation grouting; uplift pressures measured.
Canal headworks incorporated in structure of dam; apron shaped to localize jump near over-fall; foundation grouting; uplift pressures measured.
New design features in Willwood diversion dam
Eng. News-Rec
Houk, I.E. (author)
1927
5 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction features of the Willwood Diversion Dam, built by Reclamation Bureau
Engineering Index Backfile | 1928
|Construction features of the Willwood Diversion Dam, built by Reclamation Bureau
Engineering Index Backfile | 1928
|Construction features of the Willwood Diversion Dam, built by Reclamation Bureau
Engineering Index Backfile | 1928
|Willwood dam building points the way for newer methods
Engineering Index Backfile | 1929
|