A platform for research: civil engineering, architecture and urbanism
Design of three stages of Tongariro hydroelectric power development approved for construction, and future fourth and fifth stages that complete development plan; approved stages include 25 mi of tunnels, five dams, 10 mi of canals, and power station with installed capacity of 200 Mw; these stages will produce total of 1530 Gwh/yr.
Design of three stages of Tongariro hydroelectric power development approved for construction, and future fourth and fifth stages that complete development plan; approved stages include 25 mi of tunnels, five dams, 10 mi of canals, and power station with installed capacity of 200 Mw; these stages will produce total of 1530 Gwh/yr.
General description of Tongariro hydro-electric power development
New Zealand Eng
Davie, J. (author)
1967
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cultural perspectives-Tongariro World Heritage Celebrations
British Library Conference Proceedings | 2001
|Tongariro kiwi management-A conservation risk case study
British Library Conference Proceedings | 2001
|Spray hydro electric power development
Engineering Index Backfile | 1952
|Closure to Hydro-Electric Power Development
ASCE | 2021
|