A platform for research: civil engineering, architecture and urbanism
Eliminating a tunnel without interrupting traffic
Bessemer and Lake Erie R.R. converts tunnel into deep open cut and builds bridge over first lift of cut; no work trains on main tracks.
Eliminating a tunnel without interrupting traffic
Bessemer and Lake Erie R.R. converts tunnel into deep open cut and builds bridge over first lift of cut; no work trains on main tracks.
Eliminating a tunnel without interrupting traffic
Eng. News-Rec
1922
4 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Relining a tunnel without interrupting traffic
Engineering Index Backfile | 1924
|Replacing railway bridges without interrupting traffic
Engineering Index Backfile | 1926
|Tunnel Enlargement Machine fur Modernisation without interrupting Services
British Library Online Contents | 2007
European Patent Office | 2020
|Installing a sewer under a busy street without interrupting traffic
Engineering Index Backfile | 1929
|