A platform for research: civil engineering, architecture and urbanism
Reconstruction of Toronto street railway system on large scale
Track rehabilitation carried out by methods designed primarily for speed. Notes on steamshovel grading, rapid pavement breaking and batch-transfer method of concreting.
Reconstruction of Toronto street railway system on large scale
Track rehabilitation carried out by methods designed primarily for speed. Notes on steamshovel grading, rapid pavement breaking and batch-transfer method of concreting.
Reconstruction of Toronto street railway system on large scale
Contract Rec
Contract Record ; 35
1921
6 pages
15 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of queen street sewer, Toronto
Engineering Index Backfile | 1918
|Reconstruction of the Memphis street railway system
Engineering Index Backfile | 1908
Engineering Index Backfile | 1951
Bathurst street bridge, Toronto
Engineering Index Backfile | 1931
|North Bathurst street bridge, Toronto
Engineering Index Backfile | 1930
|