A platform for research: civil engineering, architecture and urbanism
Building a five-span concrete bridge in cold weather
Manure protection raised temperature during first 72 hours. Simple but effective methods used in placing protection.
Building a five-span concrete bridge in cold weather
Manure protection raised temperature during first 72 hours. Simple but effective methods used in placing protection.
Building a five-span concrete bridge in cold weather
Eng. News-Rec
Scales, G.F. (author)
1922
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building a small concrete arch bridge in cold weather
Engineering Index Backfile | 1930
|Concrete hotel building collapses after cold weather
Engineering Index Backfile | 1925
Bridge span replaced in five hours
Engineering Index Backfile | 1957
|Free-span prestressed concrete bridge
Engineering Index Backfile | 1952
|