A platform for research: civil engineering, architecture and urbanism
Building submerged steel pipeline across Yakima
Welded steel line 340 ft long, weighing 65 tons, was placed across Yakima River at Richland, Wash, by process of floating and submerging; pipe was delivered in 20 ft lengths; it is steel shell, covered with mesh and coated with pneumatic grout; inside is coated with bituminous material; procedure of laying.
Building submerged steel pipeline across Yakima
Welded steel line 340 ft long, weighing 65 tons, was placed across Yakima River at Richland, Wash, by process of floating and submerging; pipe was delivered in 20 ft lengths; it is steel shell, covered with mesh and coated with pneumatic grout; inside is coated with bituminous material; procedure of laying.
Building submerged steel pipeline across Yakima
Pacific Builder Engr
1953
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1968
|Building high-head siphons on the Yakima project
Engineering Index Backfile | 1929
Engineering Index Backfile | 1931
Engineering Index Backfile | 1945
|Box-girder Bridge at Yakima, Wash
Engineering Index Backfile | 1939
|