A platform for research: civil engineering, architecture and urbanism
Timber diversion dam, trash rack, and headgates in Rio Grande Canal at Monte Vista, Colo have been replaced with concrete structures; article describes construction, special feature of which is system of automatic headgate controls; control apparatus is sensitive to variations of only 0.02 ft in water level.
Timber diversion dam, trash rack, and headgates in Rio Grande Canal at Monte Vista, Colo have been replaced with concrete structures; article describes construction, special feature of which is system of automatic headgate controls; control apparatus is sensitive to variations of only 0.02 ft in water level.
On Colorado canal control is automatic
Western Construction
Bryning, K.F. (author)
Western Construction ; 28
1953
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Montrose irrigation canal, Colorado
Engineering Index Backfile | 1899
|Machines and methods for canal construction, Colorado river aqueduct
Engineering Index Backfile | 1938
|Machines and methods for canal construction, Colorado river aqueduct
Engineering Index Backfile | 1938
|Simulation of Automatic Canal Control Systems
British Library Online Contents | 2005
|