A platform for research: civil engineering, architecture and urbanism
Plant on Lewis River in Washington will produce 108,000 kw; dam constructed of sand and gravel found close to site; impervious core made of silt; height of dam 323 ft, downstream slope 2:1, upstream slope 2.5:1; main dam contains 4,200,807 cu yd of fill; spillway is 1090-ft long concrete channel containing five 40-ft wide, 30-ft high tainter gates; turbines are of Francis type 70,000-hp rated capacity, under net head of 224 ft and at 150 rpm. (See also Western Construction v 27 n 12 Dec 1952 p 70-5)
Plant on Lewis River in Washington will produce 108,000 kw; dam constructed of sand and gravel found close to site; impervious core made of silt; height of dam 323 ft, downstream slope 2:1, upstream slope 2.5:1; main dam contains 4,200,807 cu yd of fill; spillway is 1090-ft long concrete channel containing five 40-ft wide, 30-ft high tainter gates; turbines are of Francis type 70,000-hp rated capacity, under net head of 224 ft and at 150 rpm. (See also Western Construction v 27 n 12 Dec 1952 p 70-5)
Yale hydroelectric project
Elec West
deLuccia, E.R. (author)
Electrical West ; 109
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
|Petenwell hydroelectric project
Engineering Index Backfile | 1951
|Engineering Index Backfile | 1961
|Engineering Index Backfile | 1955
|ASCE | 2021
|