A platform for research: civil engineering, architecture and urbanism
Application of highly organized tunnelling and rock excavation methods during construction of generating station No. 2 rated 1,200,000 hp; elements of project designed to deliver 40, 000 cfs to station; intakes, tunnels, and canal section; geology of area considered; practices of excavation and mining; diagrams. (See also - n 5 May 1953 p 63-8; Compressed Air Mag v 58 n 8, 9 Aug 1953 p 210-7, Sept p 244-50)
Application of highly organized tunnelling and rock excavation methods during construction of generating station No. 2 rated 1,200,000 hp; elements of project designed to deliver 40, 000 cfs to station; intakes, tunnels, and canal section; geology of area considered; practices of excavation and mining; diagrams. (See also - n 5 May 1953 p 63-8; Compressed Air Mag v 58 n 8, 9 Aug 1953 p 210-7, Sept p 244-50)
Ontario hydro project at Niagara Falls
Can Min J
Rice, H.R. (author)
1953
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ontario hydro project at Niagara Falls
Engineering Index Backfile | 1953
|Niagara Falls Ontario High Rate Treatment Project
British Library Conference Proceedings | 2010
|Engineering Index Backfile | 1905
|Ontario hydro construction: on-schedule at Niagara
Engineering Index Backfile | 1953
Investigations in the Buried St. Davids Gorge, Niagara Falls, Ontario
British Library Conference Proceedings | 1992
|