A platform for research: civil engineering, architecture and urbanism
Application of highly organized tunnelling and rock excavation methods during construction of generating station No. 2 rated 1,200,000 hp; elements of project designed to deliver 40,000 cfs to station; intakes, tunnels, and canal section; geology of area considered; practices of excavation and mining. (See also - n 8 Aug 1953 p 210-7; Can Min J v 74 n 5, 6 May 1953 p 63-8, June p 76-83)
Application of highly organized tunnelling and rock excavation methods during construction of generating station No. 2 rated 1,200,000 hp; elements of project designed to deliver 40,000 cfs to station; intakes, tunnels, and canal section; geology of area considered; practices of excavation and mining. (See also - n 8 Aug 1953 p 210-7; Can Min J v 74 n 5, 6 May 1953 p 63-8, June p 76-83)
Ontario hydro project at Niagara Falls
Copressed Air Mag
Rice, H.R. (author)
1953
7 pages
Diagrams
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ontario hydro project at Niagara Falls
Engineering Index Backfile | 1953
|Niagara Falls Ontario High Rate Treatment Project
British Library Conference Proceedings | 2010
|Engineering Index Backfile | 1905
|Ontario hydro construction: on-schedule at Niagara
Engineering Index Backfile | 1953
Investigations in the Buried St. Davids Gorge, Niagara Falls, Ontario
British Library Conference Proceedings | 1992
|