A platform for research: civil engineering, architecture and urbanism
Cost of the concrete balcony floors of the Lockport power house, Chicago drainage canal
Describes the construction of these reinforced-concrete floors, giving estimate of cost. The work was done by day labor. (1600 w.) (No. 14394)
Cost of the concrete balcony floors of the Lockport power house, Chicago drainage canal
Describes the construction of these reinforced-concrete floors, giving estimate of cost. The work was done by day labor. (1600 w.) (No. 14394)
Cost of the concrete balcony floors of the Lockport power house, Chicago drainage canal
Engng-Con
Sherman, L.K. (author)
1910
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Chicago Sanitary and Ship Canal at Lockport Rehabilitation Case Study
British Library Conference Proceedings | 2017
|British Library Conference Proceedings | 2012
|Engineering Index Backfile | 1892