Reconstruction of Greenwell's No. 1 Dry Dock and ancillary works at Sunderland
Difficulties encountered before main cofferdam could be built; new dock was connected by tunnel to pumping system of adjacent No. 2 Dry Dock thus making possible use of No. 2 Dock pumping equipment for both docks; largest box flap gate so far constructed is used to close entrance of new dock. (See also - discussion p 340-64)
Reconstruction of Greenwell's No. 1 Dry Dock and ancillary works at Sunderland
Difficulties encountered before main cofferdam could be built; new dock was connected by tunnel to pumping system of adjacent No. 2 Dry Dock thus making possible use of No. 2 Dock pumping equipment for both docks; largest box flap gate so far constructed is used to close entrance of new dock. (See also - discussion p 340-64)
Reconstruction of Greenwell's No. 1 Dry Dock and ancillary works at Sunderland
Instn Civ Engrs -- Proc
Ridehalgh, H. (author)
1953
20 pages
Supp Plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of concrete quay in Hendon Dock Sunderland
Engineering Index Backfile | 1935
|Dock-entrance reconstruction works
Engineering Index Backfile | 1929
Elsevier | 2010
|The reconstruction of the Wearmouth bridge, Sunderland
Engineering Index Backfile | 1929
Online Contents | 2012
|