A platform for research: civil engineering, architecture and urbanism
First-order survey pin-points construction across Tampa Bay
Preliminary work for 11-mi crossing which consists of five sections of hydraulically placed embankment and four bridge structures; development of survey control system to serve for alignment and location of borings and index piles; construction of survey towers for supporting instrument and its observers; base lines of 7500 and 9000 ft in length were measured in sections of 2000 ft.
First-order survey pin-points construction across Tampa Bay
Preliminary work for 11-mi crossing which consists of five sections of hydraulically placed embankment and four bridge structures; development of survey control system to serve for alignment and location of borings and index piles; construction of survey towers for supporting instrument and its observers; base lines of 7500 and 9000 ft in length were measured in sections of 2000 ft.
First-order survey pin-points construction across Tampa Bay
Civ Eng (NY)
Hakman, P.A. (author)
1953
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fifteen mile toll bridge under construction across Lower Tampa Bay
Engineering Index Backfile | 1952
Four lanes across Tampa Bay at low cost
Engineering Index Backfile | 1956
|Online Contents | 1994
British Library Online Contents | 2018
|