A platform for research: civil engineering, architecture and urbanism
Rebuilding condemned 33-yr-old bridge and constructing parallel prestressed structure, Florida's highway engineers achieved double capacity across 2 1/2 mi of water; new bridge, constructed 80 ft north of old, has 252 48-ft spans, 20 72-ft spans, and one 3-span continuous unit at channel with span lengths of 74, 86.5, and 74 ft; most distinctive difference from old bridge is at channel where there is fixed span with 45-ft clearance rather than draw span.
Rebuilding condemned 33-yr-old bridge and constructing parallel prestressed structure, Florida's highway engineers achieved double capacity across 2 1/2 mi of water; new bridge, constructed 80 ft north of old, has 252 48-ft spans, 20 72-ft spans, and one 3-span continuous unit at channel with span lengths of 74, 86.5, and 74 ft; most distinctive difference from old bridge is at channel where there is fixed span with 45-ft clearance rather than draw span.
Four lanes across Tampa Bay at low cost
Eng News-Rec
Dean, W.E. (author)
Engineering News-Record ; 157
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Four Lanes Primary School, Chineham
Online Contents | 1986
|First-order survey pin-points construction across Tampa Bay
Engineering Index Backfile | 1953
|Variability of traffic-flow measures across freeway lanes
Online Contents | 1999
|Variability of traffic-flow measures across freeway lanes
British Library Online Contents | 1999
|