A platform for research: civil engineering, architecture and urbanism
Bridge built of precast pumice concrete
Highway bridge in Blaine County, Idaho, is made up of three 40-ft single lane spans, designed for H20 loading; each span consists of two beams spaced 8 ft on centers and 5 ft 8 in.×16 ft deck; 14×36 in. precast beams weigh 5 1/2 tons only half weight of sand gravel reinforced concrete; deck units consist of 8 in. thick slab and two 6×13 5/8 in. joists weighing about two tons apiece.
Bridge built of precast pumice concrete
Highway bridge in Blaine County, Idaho, is made up of three 40-ft single lane spans, designed for H20 loading; each span consists of two beams spaced 8 ft on centers and 5 ft 8 in.×16 ft deck; 14×36 in. precast beams weigh 5 1/2 tons only half weight of sand gravel reinforced concrete; deck units consist of 8 in. thick slab and two 6×13 5/8 in. joists weighing about two tons apiece.
Bridge built of precast pumice concrete
Eng News-Rec
Engineering News-Record ; 150
1953
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge floor built of precast concrete slabs secured by welding
Engineering Index Backfile | 1931
Bridge floor built of precast concrete slabs secured by welding
Engineering Index Backfile | 1931
NTIS | 1994
European Patent Office | 2021
Prestressed concrete bridge built at Ager (Austria) from large precast members
Engineering Index Backfile | 1963
|