Lifting and reconstruction of destroyed reinforced concrete bridge over Enz River, Germany
Total length 109 m divided into four spans of 2×23 and 2×31.5 m; width 10.5 m, carried by three main girders; bridge was destroyed by blasting center pier; reinforcing bars had to be cut and then rewelded after lifting tests made on welds.
Lifting and reconstruction of destroyed reinforced concrete bridge over Enz River, Germany
Total length 109 m divided into four spans of 2×23 and 2×31.5 m; width 10.5 m, carried by three main girders; bridge was destroyed by blasting center pier; reinforcing bars had to be cut and then rewelded after lifting tests made on welds.
Lifting and reconstruction of destroyed reinforced concrete bridge over Enz River, Germany
Hebung und Wiederherstellung einer zerstoerten Stahlbetonbruecke
Schoettgen, J. (author)
1952
5 pages
Illustrations
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced-concrete bridge over the Alb river near Karlsruhe, Germany
Engineering Index Backfile | 1926
|Reinforced-concrete frame highway bridge over Nister River in Germany
Engineering Index Backfile | 1932
|Lifting of bridge over Saalach river at Reichenhall, Germany
Engineering Index Backfile | 1951
|Concrete bridge destroyed to test it
Engineering Index Backfile | 1964
Reinforced-concrete bridge over Elorn river
Engineering Index Backfile | 1931
|