A platform for research: civil engineering, architecture and urbanism
First barrel of 71-mi reinforced concrete aqueduct was built in 1946; financing of second barrel provides for repayment over 40-yr period; new work consists of concrete pipe line of 85 cfs design capacity bringing aqueduct total to 170 cfs; improved methods adopted for backfilling. (See also Excavating Engr v 47 n 8 Aug 1953 p 20-5)
First barrel of 71-mi reinforced concrete aqueduct was built in 1946; financing of second barrel provides for repayment over 40-yr period; new work consists of concrete pipe line of 85 cfs design capacity bringing aqueduct total to 170 cfs; improved methods adopted for backfilling. (See also Excavating Engr v 47 n 8 Aug 1953 p 20-5)
San Diego's double-barreled aqueduct
Eng News-Rec
Green, R.J. (author)
Engineering News-Record ; 151
1953
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
San Diego's double-barreled aqueduct
Engineering Index Backfile | 1953
|San Diego's Accident Prevention Program
Wiley | 1949
|San Diego's Experience With RPM Pipe
Wiley | 1972
|SAN DIEGO'S MUSEUM OF CONTEMPORARY ART
British Library Online Contents | 2007