A platform for research: civil engineering, architecture and urbanism
First barrel of 71-mi reinforced concrete aqueduct was built in 1946; financing of second barrel provides for repayment over 40-yr period; new work consists of concrete pipe line of 85 cfs design capacity bringing aqueduct total to 170 cfs; improved methods adopted for backfilling. (See also similar unsigned description in Eng News-Rec v 151 n 4 July 23 1953 p 35-6)
First barrel of 71-mi reinforced concrete aqueduct was built in 1946; financing of second barrel provides for repayment over 40-yr period; new work consists of concrete pipe line of 85 cfs design capacity bringing aqueduct total to 170 cfs; improved methods adopted for backfilling. (See also similar unsigned description in Eng News-Rec v 151 n 4 July 23 1953 p 35-6)
San Diego's double-barreled aqueduct
Excavating Engr
Green, R.J. (author)
Excavating Engineer ; 47
1953
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
San Diego's double-barreled aqueduct
Engineering Index Backfile | 1953
|San Diego's Experience With RPM Pipe
Wiley | 1972
|San Diego's Accident Prevention Program
Wiley | 1949
|San Diego's Sewer Condition Assessment Program
ASCE | 2004
|