A platform for research: civil engineering, architecture and urbanism
Framing precast for floating drydock
Precast concrete Vierendeel trusses brace decks and wing walls of 400 ft long floating drydock being built for Navy at Seattle, Wash; bulkheads, walls and decks were cast in place in long continuous pours to form integrated, watertight structure; concrete was made with fly ash.
Framing precast for floating drydock
Precast concrete Vierendeel trusses brace decks and wing walls of 400 ft long floating drydock being built for Navy at Seattle, Wash; bulkheads, walls and decks were cast in place in long continuous pours to form integrated, watertight structure; concrete was made with fly ash.
Framing precast for floating drydock
Eng News-Rec
Engineering News-Record ; 153
1954
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
Unusual floating drydock combines steel and wood
Engineering Index Backfile | 1946
|Floating drydock for seaplanes uses sleeve pontoon towers
Engineering Index Backfile | 1945
Navy's largest concrete floating drydock launched at Seattle
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1963
|