A platform for research: civil engineering, architecture and urbanism
Method of timbering No. 3 seam mined at Nordegg, Alberta; seam pitches 12° and varies in height from 5 to over 30 ft; mine is worked by room and pillar method, using double entry system; use of ordinary bridge stick and "square set" methods of timbering.
Method of timbering No. 3 seam mined at Nordegg, Alberta; seam pitches 12° and varies in height from 5 to over 30 ft; mine is worked by room and pillar method, using double entry system; use of ordinary bridge stick and "square set" methods of timbering.
Timbering in thick seams
Can Min Met Bul
Amico, Z.D. (author)
1954
4 pages
Diagrams
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
FORMWORK TIMBERING METHOD AND FORMWORK TIMBERING STRUCTURE
European Patent Office | 2019
|