A platform for research: civil engineering, architecture and urbanism
Bridge erected on rolling bents
Methods used by Texas and Pacific for replacing two 33-ft girder spans with two 78-ft deck plate girder units for railroad bridge carrying four tracks and five turnouts; rolling steel bents mounted on flanged dollies operating on track served as falsework for supporting new underpass structure while it was being erected in two parts, and also as carriage for moving halves transversely into final position.
Bridge erected on rolling bents
Methods used by Texas and Pacific for replacing two 33-ft girder spans with two 78-ft deck plate girder units for railroad bridge carrying four tracks and five turnouts; rolling steel bents mounted on flanged dollies operating on track served as falsework for supporting new underpass structure while it was being erected in two parts, and also as carriage for moving halves transversely into final position.
Bridge erected on rolling bents
Ry Track Structures
1954
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pushover Analysis of Bridge Intermediate Bents
British Library Conference Proceedings | 2003
|Plate girder bridge with pile bents
Engineering Index Backfile | 1905
|Fragility Analysis of RC Bridge Bents
British Library Conference Proceedings | 2002
|Fixed bents for Texas highway bridge
Engineering Index Backfile | 1954
|Cyclic Behavior of Concrete Bridge Bents
Online Contents | 1997
|