A platform for research: civil engineering, architecture and urbanism
Construction work at west end was advanced with difficulty until Lewis cantilever girder was designed, made, and installed to cope with soft material in bench headings.
Construction work at west end was advanced with difficulty until Lewis cantilever girder was designed, made, and installed to cope with soft material in bench headings.
Soft rock operations in Moffat tunnel
Du Pont Mag
Anderson, A.E. (author)
Du Pont Magazine ; 20
1926
2 pages
11 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting operations on Moffat water tunnel
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1927
Engineering Index Backfile | 1927
Unanticipated Benefits: The Moffat Tunnel
ASCE | 2019
|Construction of the Moffat tunnel
Engineering Index Backfile | 1928
|