A platform for research: civil engineering, architecture and urbanism
Concreting operations on Moffat water tunnel
Methods and equipment used in concrete lining of 10.5 ft diam pioneer bore of Moffat railroad tunnel, modified for Denver transmountain water diversion; concretelined portion of tunnel is about 16,000 ft long.
Concreting operations on Moffat water tunnel
Methods and equipment used in concrete lining of 10.5 ft diam pioneer bore of Moffat railroad tunnel, modified for Denver transmountain water diversion; concretelined portion of tunnel is about 16,000 ft long.
Concreting operations on Moffat water tunnel
Civ Eng (NY)
Barlow, G.R. (author)
1936
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Soft rock operations in Moffat tunnel
Engineering Index Backfile | 1926
|Engineering Index Backfile | 1927
Engineering Index Backfile | 1927
Engineering Index Backfile | 1931
|Unanticipated Benefits: The Moffat Tunnel
ASCE | 2019
|