A platform for research: civil engineering, architecture and urbanism
Rapid work in repaving lindell boulevard in St. Louis
Macadam on telford laid in 1886 resurfaced in 1904 with 2-in. bitulithic is being used as subbase for bitulithic on concrete base.
Rapid work in repaving lindell boulevard in St. Louis
Macadam on telford laid in 1886 resurfaced in 1904 with 2-in. bitulithic is being used as subbase for bitulithic on concrete base.
Rapid work in repaving lindell boulevard in St. Louis
Eng. News-Rec
Horner, W.W. (author)
1926
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rapid repaving of a busy St. Louis thoroughfare
Engineering Index Backfile | 1928
|Granite block repaving in Worcester
Engineering Index Backfile | 1915
|Repaving for very severe conditions
Engineering Index Backfile | 1950
Repaving granite block streets in New York
Engineering Index Backfile | 1920