A platform for research: civil engineering, architecture and urbanism
Building an eight-lane paved highway
Construction of 13 miles of super-highway out of Detroit, Mich., from Wayne County line to Pontiac; two 44-ft. concrete slabs in 200-ft. right-of-way being constructed to carry traffic averaging 14,000 vehicles in 24 hours.
Building an eight-lane paved highway
Construction of 13 miles of super-highway out of Detroit, Mich., from Wayne County line to Pontiac; two 44-ft. concrete slabs in 200-ft. right-of-way being constructed to carry traffic averaging 14,000 vehicles in 24 hours.
Building an eight-lane paved highway
Eng. News-Rec
1926
4 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
British Library Conference Proceedings | 2000
|Simplified methods of building paved seaplane slipways
Engineering Index Backfile | 1943
|