A platform for research: civil engineering, architecture and urbanism
In building two steel viaducts on 17-mile cutoff constructed by Burlington near Beardstown, Ill., two original schemes of erection were developed: one involved tandem arrangement of two machines, while other involved unusual rolling operation.
In building two steel viaducts on 17-mile cutoff constructed by Burlington near Beardstown, Ill., two original schemes of erection were developed: one involved tandem arrangement of two machines, while other involved unusual rolling operation.
Two unusual erection schemes
Ry. Eng. Maintenance
Cramer, F.H. (author)
1926
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1954
|Schemes of erection proposed for the Quebec bridge
Engineering Index Backfile | 1911
Unusual resourcefulness marks erection of temporary bridge after Vermont flood
Engineering Index Backfile | 1928
Engineering Index Backfile | 1964
|Wiley | 2011
|