A platform for research: civil engineering, architecture and urbanism
South-European pipe line
General conception and construction problems; 782 km long, 86 cm in diam pipe line connecting Mediterranean port of Lavera (France) with Strassbourg (France) and Karlsruhe (West Germany) oil refineries, was completed in 20 mo; selection of proper pipe material and of other equipment as well as various construction phases of system are summarized; construction costs are indicated; construction method resulted in completion of system on time and within limits of estimated costs.
South-European pipe line
General conception and construction problems; 782 km long, 86 cm in diam pipe line connecting Mediterranean port of Lavera (France) with Strassbourg (France) and Karlsruhe (West Germany) oil refineries, was completed in 20 mo; selection of proper pipe material and of other equipment as well as various construction phases of system are summarized; construction costs are indicated; construction method resulted in completion of system on time and within limits of estimated costs.
South-European pipe line
Pipe-Line Sud-Europeen -- Problemes gene raux de conception et de construction
Lester, C.B. (author) / Villepelet, J. (author)
Travaux ; 47
1963
6 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
South European pipe line; river crossings
Engineering Index Backfile | 1963
|South European pipe line; survey and construction of main line
Engineering Index Backfile | 1963
|UK-to-Belgium pipe line stirs European gas market
Online Contents | 1996
|Line Pipe Tables Line Pipe Tables
Online Contents | 2010
Construction records are made on south Texas brine pipe line
Engineering Index Backfile | 1934
|