A platform for research: civil engineering, architecture and urbanism
Placing fill nears peak at nacimiento dam
Construction of zone-type rolled earth embankment 1500 ft long at crest and 260 ft max height above lowest part of foundation; excavation of cut-off trench 30 ft deep across river channel section; foundation grouting for full length of dam; gateless concrete spillway with 150-ft crest length on left abutment directly above high-level gated outlet works; low-level outlet works under embankment on right abutment.
Placing fill nears peak at nacimiento dam
Construction of zone-type rolled earth embankment 1500 ft long at crest and 260 ft max height above lowest part of foundation; excavation of cut-off trench 30 ft deep across river channel section; foundation grouting for full length of dam; gateless concrete spillway with 150-ft crest length on left abutment directly above high-level gated outlet works; low-level outlet works under embankment on right abutment.
Placing fill nears peak at nacimiento dam
Western Construction
Western Construction ; 31
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2008
|Placing hydraulic fill at fort peck
Engineering Index Backfile | 1936
|Nacimiento Water Project Intake Facility
British Library Conference Proceedings | 2007
|Placing earth fill for Colombia's Troneras dam
Engineering Index Backfile | 1963
|