A platform for research: civil engineering, architecture and urbanism
Tests, plant, and methods developed for world's largest earth dam; dredging plan; designing dam; dredging plant and operation; pipe lines and fill placement; controlling hydraulic fill; operating statistics; progress in hydraulic-fill operations. From paper before Am Soc Civ Engrs.
Tests, plant, and methods developed for world's largest earth dam; dredging plan; designing dam; dredging plant and operation; pipe lines and fill placement; controlling hydraulic fill; operating statistics; progress in hydraulic-fill operations. From paper before Am Soc Civ Engrs.
Placing hydraulic fill at fort peck
Civ Eng (NY)
Larkin, T.B. (author)
1936
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Moving mountains of earth fill at fort peck dam project
Engineering Index Backfile | 1935
|ASCE | 2021
|Engineering Index Backfile | 1942
|Engineering Index Backfile | 1934
|